CHANNELSTV — broadcast 20260806 150000 UTC 421 transcript segments Google Speech-to-Text API Automatic Transcription (Chirp) Data courtesy of The GDELT Project (https://www.gdeltproject.org/), from the Internet Archive TV News Archive. Machine transcription. Treat it as a searchable index of what was broadcast, not a verbatim quotation record. [00:00:00] to the president, the president will not say no, it doesn't make sense, you start with [00:00:04] adulize route, you go to a single carriage way, and then you [00:00:07] now come to another carriage way, [00:00:11] double, in [00:00:15] me of fact, one mad man in my community, they used to give him [00:00:18] 100 n, and this time he [00:00:21] of was given 50 naira, and he said to the person that gave it to say, [00:00:25] come, are you going up or coming down, so [00:00:29] when we now with dualization [00:00:31] we have to end with the dualization and so [00:00:35] told f you [00:00:38] see that this minister has exhausted all his limit [00:00:42] the 82 km is also attracted by [00:00:49] of me him to ibadon [00:00:52] you ibadon 82 km that's 114 [00:00:56] billion the other 44 km dualized. [00:01:01] is 110 billion, has he not exhausted his [00:01:03] limit? he said, no, i have to be [00:01:07] careful, it's [00:01:08] of a representative [00:01:09] of the president, so i have to be very careful, and [00:01:13] so we are happy for the flag off [00:01:16] of these two projects, the [00:01:18] of representative [00:01:18] of the president will do it at the right time, but let [00:01:22] me say that yesterday we were on the [00:01:26] road to ondo state. [00:01:30] of We went to [00:01:34] inspect the section of Lagos [00:01:37] Calaba Coaster [00:01:39] of Highway within that Ogun and the Ondo section is [00:01:43] 82 km (28 km) is [00:01:47] ongoing at Ogun section and 52 [00:01:50] km at the ondo section. Let [00:01:53] me assure all the critics that say [00:01:57] that the Lagos Carabak Coastal Highway will. [00:02:01] it has since selved section 1 [00:02:04] 44.47 [00:02:06] of km fully completed and it is investment, [00:02:09] lot of investors are [00:02:12] of looking to [00:02:15] of of give us the full cost of that project and to have it told, we are working on [00:02:19] that. session two is 70% completed, [00:02:22] 55 km that ended between ogun and [00:02:26] the legos [00:02:28] of you boundary, that is... 3a and 3b [00:02:32] 75 [00:02:32] of km ongoing at [00:02:34] of both kalaba and [00:02:35] a the cross and that project [00:02:39] is ongoing and we have achieved over [00:02:43] 30%. we have 4a and 4b 82 [00:02:47] km dualized and that is ongoing and the major [00:02:51] work there has reached over 60%. in fact [00:02:55] when my the [00:02:56] ass said to mr president saw the terrain yesterday this [00:03:00] say that what God cannot do does not exist [00:03:03] because [00:03:04] of the kind of terrain and yet [00:03:07] it is been [00:03:07] of done, it's been done by a man of audacity, a [00:03:11] man that tamed the Atlantic Ocean, a man of great [00:03:15] repute, the divine president of this country and the incoming [00:03:19] 2027 of second tenor president [00:03:22] president, can we put our hands together for him, [00:03:26] yes [00:03:33] of [00:03:48] of [00:04:00] been built on reforced concrete pavements [00:04:04] been [00:04:05] a built of and the over 60% is been achieved and within that [00:04:09] axis before you get to ore we have 24 [00:04:12] km that is [00:04:13] in a terrible condition. let [00:04:15] me assure the people that are using that road that i will be taking [00:04:19] it [00:04:19] of to of mr. president something will be done. we were on that road for more [00:04:23] than seven hours and you begin to ask yourself before [00:04:27] president came on board. what did the [00:04:31] successive government do on our roads and that's why we are [00:04:35] no longer constructing road, we are building legacy [00:04:39] of roads, we are [00:04:40] of building roads that will last over 100 years and i'm very [00:04:44] happy that the governors, the begins of mr [00:04:47] president are here, governor, the president has directed that the 100 [00:04:51] km of that legos calabar should be designed and procurement [00:04:55] should be started, governor dodo, let [00:04:58] me tell you that the president has directed that from [00:05:01] lokoja all the way to Benin and all the way [00:05:05] to Warri 401 km times 2 [00:05:09] 802 km should be: [00:05:12] scoped and they should be done under [00:05:15] EPC++F. I don't want our detractors to [00:05:19] know what EPC+ means, but it means [00:05:23] faster procurement, it means you know more money will [00:05:26] be made available, it means that road will be built. This [00:05:30] president is the only president that is doing the [00:05:34] impossible. The dream of 30 years, Lagos [00:05:37] Calab, the dream of our founding fathers of [00:05:41] Sokoto Badagri. 10068 km four [00:05:45] sections ongoing, if you go to Legos Calabar, I [00:05:49] won't forget the the theiboom section, section two of [00:05:52] it, 180 km by two, 360 [00:05:56] km, that project is ongoing, time we fall [00:05:59] me, but let assure the people of [00:06:02] Nigeria that we are building roads, abuja, [00:06:06] kaduna, zaria cano, since we started no [00:06:10] kidnapping on that road, the road president is [00:06:13] building, it's tackling the security we made on [00:06:16] ground, it's tackling the hunger we made on ground, [00:06:20] it's [00:06:21] it, it [00:06:21] is catallic to our economic revolution, it [00:06:24] is also catallic to our cars, to our [00:06:28] education, for peace, for employment, we have [00:06:31] thousands and thousands of people on this road, direct jobs and [00:06:35] indirect jobs, let's put our hands together for our [00:06:38] president [00:06:44] let me also says that the president is [00:06:47] building [00:06:51] 260 km dualized [00:06:54] 760 billion you ask what are we borrowing [00:06:58] for? here from me, we are borrowing to [00:07:02] rebuild all the existing [00:07:05] roads that we build were [00:07:08] constructed before, when we finish this we [00:07:12] told the road, there will be lot of facilities along the [00:07:16] corridor and we will not touch it in terms of maintenance for [00:07:20] the next 100 years, that is what God sent [00:07:23] president to do, knowing [00:07:26] therefore all this projects that are way house in osuon [00:07:30] state, will you not vote [00:07:32] APC [00:07:41] state? just like he has favored all the states [00:07:45] the federation, fair president, divine [00:07:48] president, a man of great intellectual [00:07:52] capacity, the incoming president [00:07:55] sitting very strongly and very wonderful [00:07:59] democrats, can we put our hands together for Mr. [00:08:02] President, and therefore on 15th of [00:08:06] this month you have to, because of [00:08:10] all these great works that the president [00:08:42] presidency [00:08:43] you have to go and they do malaria test for the [00:08:46] person because of what the president is [00:08:49] doing before president came tell [00:08:53] me one road you could ride through for two hours in the [00:08:57] entire southwest that are federal roads so [00:09:01] anybody that is challenging him must have had mosquito [00:09:05] bite at night and deserve malaria treatment [00:09:09] not be so don't be so [00:09:13] and so all the APC candidate [00:09:15] 2027, we shall do more, and the this [00:09:19] state will begin to construy their rose with reinforced [00:09:23] concrete pavement, just like ododo is doing, just [00:09:27] like the acquakuristic senator Monday is [00:09:31] doing, and these two people, you know my [00:09:34] Bible, I prophet as little children therefore, be [00:09:38] therefore imitator of Christ as your Lord, I'm a... [00:09:42] is telling you that these people imitate president [00:09:46] in the audacity to develop their states and I'm very very happy [00:09:50] with them, very proud them, very proud them, they are not saying this is federal [00:09:54] road, this is state road, they know that when a road is [00:09:57] built, whether it's state of federal, the first beneficiary [00:10:01] is the government of that state, because the IGR is increased, [00:10:05] and so build your roads, use the resources that the president [00:10:09] has given to you, for you governors. I don't see why the [00:10:13] roads in our should stay should still be where it is, but [00:10:17] a time has come at the time of God he makes all things are [00:10:21] beautiful, not be so, so we are very... [00:10:25] grateful, i show you these two projects will be [00:10:28] built totally on reforced concrete paavament, i will come here [00:10:32] again, work has already started in those two [00:10:35] projects, but i want them to start each the projects in at least [00:10:39] two sections, the job shall be done, trust [00:10:43] president b table, it shall be done, those in support [00:10:47] say i on [00:10:49] your [00:10:53] man, [00:11:03] on your mondate we shall [00:11:05] standard on your mandate [00:11:09] we shall stand on your [00:11:12] mandate we shall stand on [00:11:16] your monday [00:11:20] on your mandate we shall st thank you very much god [00:11:24] bless you thank you. [00:11:27] Thank you, thank you so much, at this point in time we [00:11:31] are at the most important the program, which is the time to [00:11:35] listen to the address of Mr. [00:11:37] President, at this one time I have a privilege to [00:11:41] welcome deliver the address the president of [00:11:45] Nigeria, welcome minister of marine and [00:11:48] economy, [00:11:55] Toda awọn oke [00:11:57] igbaani, eyi ni [00:12:01] mofi [00:12:02] ọpe. [00:12:25] bi ko se baba loke taari [00:12:29] okwemi [00:12:33] fun [00:12:39] okeyin ni [00:12:42] gbogbo ileri [00:12:46] olu. [00:12:54] Eh. [00:12:54] fc [00:13:41] pcl [00:13:50] laye ni papa ṣe naṣepọrọ. [00:14:30] I recognize my darling [00:14:31] wife, [00:14:39] the various chairman of committees from [00:14:43] senates and also rep on [00:14:45] works, my [00:14:49] colleague, the minister, the perf minister of [00:14:52] what, I think we need. [00:15:00] Thank you very much, the national [00:15:04] secretary of our party, [00:15:06] senator, I [00:15:08] recognize you, [00:15:12] the government [00:15:13] candidates. [00:15:37] his darling [00:15:38] wife, [00:15:43] recognized to our deputy governor's candidate, [00:15:47] engineer benjamin [00:15:50] and wife, recognize [00:15:52] you, the deputy [00:15:56] chief wave the national assembly, i [00:16:00] thank you for being here, department secretary, federal ministry [00:16:04] of works, thank you for coming, [00:16:10] the house committee on works to the [00:16:12] president, the SA [00:16:16] as committee to the president of [00:16:18] community [00:16:23] sister, thank you for being here, other members the house [00:16:27] of here, [00:16:28] particularly and [00:16:31] others, attational rulers who [00:16:35] are here in numbers. [00:17:07] got one the roads leads to your own [00:17:10] domain, the leaders of our party that [00:17:14] are here, thank you quite a lot them, [00:17:18] particularly read by [00:17:21] our engineer with me, [00:17:25] the chairman of our party, so [00:17:29] recognize [00:17:30] you, [00:17:35] the contractors and to project [00:17:38] i recognize [00:17:39] you, [00:17:47] security of status, gentlemen the [00:17:51] press, ladies and gentlemen, i'm [00:17:54] here standing in to represent mr [00:17:57] president, but before i say that [00:18:01] i want to say that i'm very happy today because the [00:18:05] fact that this is now going to be [00:18:08] completed. I said this told when I was governor [00:18:12] the state and mainly we lost [00:18:16] the election and we have new government, they abandoned [00:18:19] the road, whereas government is supposed to be a [00:18:22] continuum, it is not oyotola that is going to be [00:18:26] using the road, it is the citizens of this state that will be [00:18:30] using the road, but [00:18:32] it was abandoned. I must thank Mr. [00:18:34] President for coming to our head. to ensure that this road [00:18:38] is not [00:18:39] completed, [00:18:44] instead the asfat method [00:18:47] is not going to be concrete [00:18:51] please, [00:18:59] thank you now, the car of mr [00:19:02] president, [00:19:06] the two guys community leaders, partners in [00:19:09] progress, i [00:19:11] feel highly delighted to be here today to flag up the [00:19:15] construction [00:19:16] of [00:19:21] your states and [00:19:23] reconstruction [00:19:25] of state [00:19:29] under the renewed agenda of my [00:19:32] administration, today we are just not [00:19:36] turning the soil. we are turning a page, [00:19:39] flagging off these roads projects make clear [00:19:43] commitment to connect our people, to [00:19:46] unlock opportunities and to restore confidence [00:19:50] in public infrastructure. these tools are life l. [00:19:54] this project are very critical component the federal government's road [00:19:58] infrastructure development program, at [00:20:02] enhancing connectivity, improving road [00:20:05] safety and stimulating. economic activities [00:20:09] along the corridor to enable farmers move, go [00:20:13] faster, children get to school more savely. [00:20:17] the os road, which is approximately 82 km [00:20:20] is in terrible condition, the road [00:20:24] originates from daily yes around the b here in [00:20:28] oshogo and travasses various agriculture [00:20:31] bs of states and is [00:20:35] the shortest route from. [00:20:39] bad major towns and villages along the [00:20:41] road, [00:20:45] include osobo, ara, [00:20:49] awo. [00:20:58] awarded is in the sum of 114, [00:21:01] 854, 477, [00:21:04] 607.93 [00:21:10] with a completion period of 24 months, this [00:21:13] project we are flagging of today [00:21:17] will be constructed. to stand the test of [00:21:21] time and it shall be constructed on [00:21:24] CRCP. Oshogo road [00:21:28] is approximately 44 km by two, [00:21:32] that makes it 88 km. origin from old garage [00:21:36] rund about in oshogbo and traverses major [00:21:40] tans like owodi ede, akụda [00:21:43] ede, seconda, oogi, od [00:21:47] omu, later terminates at mogon, [00:21:59] the project s to upgrade the fair [00:22:01] portion [00:22:09] seek to upgrade a single carriage of about [00:22:12] 20 km to a dual carriage on rigid payment [00:22:16] crcp section of [00:22:20] 15.55 km from osogo to akuda at the [00:22:24] junction and the 8.6 km section [00:22:27] towards bang which are already dualized but inter [00:22:31] conditions will be reconstructed on rigid [00:22:35] payment CRCP. the corner sum as [00:22:38] awarded [00:22:39] is the sum of 101, 806, [00:22:42] 515, 825.09 to [00:22:46] Mrs. Truncates Solutions Limited. [00:22:50] period of 24 months it is important to know that this [00:22:54] projects were approved by federal executive [00:22:57] council to be procured awarded and constructed [00:23:00] ease the stress the rure users and improve [00:23:04] the accounting life the community. the scope of work [00:23:08] for this project include but not limited to side clearance, [00:23:12] artworks and removal of unsable materials, [00:23:16] provision of grave filter borders, material for. [00:23:20] side drains and friends [00:23:23] divers provision of w cross rock stone [00:23:26] base on carage way and soldier [00:23:30] provision of grade 40 concrete agity [00:23:34] pavement with reinforcement on carriage carriage [00:23:38] way and soldiers provision of solar [00:23:42] powered street lighting adequate draining [00:23:45] system planting of trees grasses and [00:23:49] provision of labor we industry, [00:23:52] provision of CCTV camera to monitor to [00:23:56] ensure security or road users. The [00:24:00] contractors have been directed to mobilize fully to site [00:24:02] as any delay will not be [00:24:05] welcomed. I have the good news of [00:24:09] serious work going on, we not have projects though the [00:24:12] nation to mention but just [00:24:14] few rehabilitation [00:24:18] work by Mr. CBC global and the [00:24:22] realization the long overview lasure aquare [00:24:26] away road by Mr. Zech construction company [00:24:30] limited who have been constructed on red [00:24:32] payment at different stages of [00:24:35] completion. The different sections the Legos [00:24:39] Calabar Coastal Highway Section 1 Legos of [00:24:43] this road has been substantially completed. Section two [00:24:46] ogun has reach 80% completion. Section [00:24:50] 3A and B. Aquare cross refer as it [00:24:54] 20% completion. 4A and [00:24:57] 4B has reach 5% completion. While [00:25:01] section 5 has just [00:25:02] be awarded and work is ongoing. I've directed more [00:25:06] sections to be designed and procured. On the [00:25:10] construction of Tokuto Badagri road. Section 1 [00:25:14] Sokuto has reach 50% completion. Section 2 [00:25:18] KB has reach 60% completion. [00:25:50] Progress of work achieve already, distribute [00:25:53] fans from kalaba, Eboyin Benin, [00:25:57] Kogi, Nasarawa, [00:26:00] atatabuja. [00:26:05] Capital cities, section one, 15% [00:26:08] completion, while section 2 is undergoing [00:26:12] mobilization, other sections are undergoing engineering [00:26:16] design, let assure you this administration will [00:26:19] enforce quality standards, transparency and value for [00:26:23] money, every n must count, every my store must be [00:26:27] met and every community must feel the benefit to our [00:26:30] contractors and engineers. deliver with [00:26:34] excellence and speed to our state and local [00:26:37] partners, let us work as team to our [00:26:40] citizens, the patience and support we guide [00:26:44] this success, together we build not just road but trust not [00:26:48] just root, but a future. may this project [00:26:51] s testament to what we can achieve when peoples meet [00:26:55] action. let me commend the ministry of works, [00:26:59] peculiar ultimate concerns who is awarded the [00:27:10] involved in all our road development, [00:27:13] and all contractors please does not be contractors but be our development [00:27:16] partner, get our youth involved in what you're doing, [00:27:20] involve them and help them to l for your operations for the [00:27:24] future and [00:27:26] for the future nation, we god on our side we shall complete this [00:27:30] project and deploy them for the benefit. [00:27:33] revolution of our nation, this all shall be [00:27:37] done and be success, thank you and may god bless [00:27:41] the of federal [00:27:42] nigeria, [00:27:44] republic [00:28:00] i have the... honor and [00:28:03] privilege that the [00:28:06] president the federal republic of [00:28:10] Nigeria, after that don't call [00:28:12] me, to flag up this very important [00:28:16] project, to the glory of [00:28:19] God and for the use of our people, God [00:28:21] bless [00:28:23] you. [00:29:33] Ileri oluwa nao ni [00:29:35] gangan [00:29:53] druk. [00:30:46] votes in the Democratic Republic of Congo under Ebola [00:30:50] quarantine after five [00:30:51] deaths. [00:30:58] Nigeria's security forces.