Google Cloud Speech-to-Text API (Chirp) + Gemini 2.5 Flash Non-Thinking. Treat it as a searchable index of what was broadcast, not a quotation record.
00:00:03Potential presidential candidate, Chancellor of Justice Julia Maze, is not yet gaining
00:00:07the required number of votes in the Riga Kogu. According to the leader of the 10200 party,
00:00:10Kristina Kallas, Madesa can currently count on the support of
00:00:1467 deputies. 68 are needed
00:00:17for election. These votes, according to Kallas, are ready to be given by the
00:00:20Reform Party, 1200 Social Democrats, and independent
00:00:23deputies. However, the Center Party itself has not yet announced its
00:00:27positions.
00:00:30The first health insurance funds in recent years have helped cover the shortage of funds in the healthcare
00:00:34system, but in a few years they may run out,
00:00:37despite a previous promise, the Minister of Social Affairs does not
00:00:40plan to ask for additional funding, the issue will probably
00:00:44have to be resolved by the next government. The Health
00:00:47Insurance Fund is facing a growing budget deficit, and accumulated
00:00:51reserves already have to be used to cover expenses. In the coming years,
00:00:55dependence on these funds will continue.
00:00:58The approved budget of the Health Insurance Fund for...
00:01:002026 provides for a deficit of just over 100
00:01:03million euros. The main goal is its reduction.
00:01:07In the spring, the Ministry of Social Affairs warned that due to worsening
00:01:10economic forecasts, the reserves of the Health Insurance Fund might not be enough until 2029.
00:01:14As one of the solutions, Minister of Social Affairs Carmen
00:01:18Yuller proposed transferring the payment for children's treatment to the state,
00:01:21since almost the entire healthcare system is currently financed by
00:01:25the social tax of working people, which is becoming
00:01:28insufficient to cover.
00:02:30income tax. Currently, the Minister
00:02:33of Social Affairs, Carmen Nyuller, plans to allocate 20 million euros annually from 2028
00:02:37for digital innovations in
00:02:39healthcare.
00:02:41Airbaltic has adjusted its winter schedule, canceling flights from Tallinn
00:02:45to London, and also changing its flight program from Riga and
00:02:49Vilnius. Airbaltic announced that passengers on canceled flights will be offered
00:02:52alternative travel options. The airline emphasized that this is
00:02:56standard practice in the industry. The Latvian airline, with a net
00:03:00loss of approximately 44 million euros at the end of last year,
00:03:03continues to look for ways to stabilize its financial
00:03:06situation.
00:03:09After the new language requirements came into force, about
00:03:12300 teacher assistants were left without jobs. These data are provided by Tallinn City Hall. However,
00:03:16about 100 vacancies have already been filled. The Ministry of Education, in
00:03:20turn, believes that there is no reason to talk about a large-scale
00:03:23staffing crisis. In the Tallinn kindergarten Pallosti,
00:03:27they continue to look for new teacher assistants.
00:03:43This should be a person who knows the language, knows how to work with children, including those with special
00:03:46needs, supports the teacher and helps them in a variety of
00:03:49situations, when one educator with twenty children gets
00:03:53tired. According to the city hall, in 3 weeks
00:03:56about 100 teacher assistants need to be found.
00:04:00a person does not meet these language qualification requirements as of
00:04:03August 1st, and so
00:04:07it happened, 300 people for this reason
00:04:10are forced to leave their
00:04:13workplaces. As of today, 90
00:04:16people have been hired, this is an ongoing
00:04:19process. The Ministry of Education claims that there is
00:04:23no reason to talk about a large-scale staffing crisis, since some
00:04:26kindergartens are indeed looking for new employees, however, other
00:04:30groups, on the contrary, are closing due to a reduction in the number of children. At the same time,
00:04:34kindergartens admit that new assistants often have to
00:04:37master the profession already at the workplace, and more experienced
00:04:40colleagues are forced to engage in their practical
00:04:44training. The Ministry urges not to exaggerate. The work that these
00:04:48people do requires fundamental
00:04:51knowledge of child support and support for teachers who
00:04:55work in kindergartens. These are not very high qualifications
00:04:59that are needed in this.
00:05:12with the Minister's opinion for the reason that a teacher's assistant
00:05:15is an active participant in the educational
00:05:19process, and it was based on this logic that
00:05:22the language requirements, in this
00:05:25case B-2, were established, and naturally, this
00:05:28work is quite difficult, both emotionally and
00:05:32physically. physically.
00:05:35Ukrainian drones attacked two large oil refineries in Russia last night.
00:05:38This was stated by the President of Ukraine, Zelensky. Drones hit an oil refinery
00:05:42in the Yaroslavl region and Ufa. This city is located approximately
00:05:461,300 km from the Ukrainian border. In addition,
00:05:50according to the Ukrainian Armed Forces, drones hit one vessel of the Russian shadow fleet
00:05:53and two military patrol boats in the Black
00:05:57Sea. The German Interior Ministry called
00:06:00yesterday's drone incident at Leipzig Airport a hybrid attack. According to German
00:06:04media, the drone, equipped with explosives, was located near
00:06:08a Ukrainian cargo plane that was transporting.
00:06:10The cargo was awaiting shipment to Ukraine. The head of the German Interior
00:06:14Ministry stated that this is a new level of threat to the country. The Bundestag
00:06:18did not rule out the involvement of Russian special services.
00:06:21Sweden will hand over to Kyiv a cargo ship
00:06:24of the Russian shadow fleet, seized in March. Ukraine suspects it of
00:06:28transporting grain stolen from occupied territories.
00:06:31The Supreme Court of Sweden previously rejected the appeal of the company that owned
00:06:35the dry cargo ship. The ship, which was heading to St. Petersburg, sailed under
00:06:38the flag of Guinea. However, according to the assessment of the Swedish
00:06:42Coast Guard, it was actually
00:06:45a stateless vessel.
00:06:49And back to Estonia. Several bars operating in Tartu's Old Town
00:06:53are concerned about the appearance of a new residential building nearby. They
00:06:56fear that in the near future they may have conflicts with local
00:06:59residents. Rütli Street is the main center
00:07:03of Tartu's nightlife. If before there were relatively
00:07:06few residential apartments in this area, by 2028
00:07:09more than 50 new ones will appear here.
00:07:20Why are they allowed to build apartments here if it is initially
00:07:23clear that there will be problems? My experience
00:07:26shows that then I have to solve all these problems myself,
00:07:29at my own expense, by my own efforts and at the cost of my own
00:07:33nerves. The scenario is already familiar to the owners
00:07:36of establishments in the Old Town; for more than a year and a half, the Genealogist
00:07:40club has been dealing with the consequences
00:07:43of noise complaints. Such disputes periodically
00:07:46arise on Rütli Street. Old Town resident Triin Var
00:07:49says that for 10 years she has repeatedly had to contact various
00:07:53authorities due to noise, but some issues
00:07:56remain unresolved to this day. I understood that it
00:08:00would be noisy here, but I did not expect such strong vibration to be felt
00:08:03through the wall. It comes from the neighboring building. I could not
00:08:07even imagine that it would be so noticeable. According to
00:08:11Jaan Tover, the owner of several Tartu bars,
00:08:14entrepreneurs have to independently eliminate the consequences
00:08:17of conflicts related to nightlife. The city hall, in turn,
00:08:21claims that possible problems will be resolved as they
00:08:24arise. It is important that future residents
00:08:28understand in which area they are acquiring housing. This
00:08:31also applies to hotels operating in the city center. At the same time,
00:08:34developers must take into account the specifics of the center. The
00:08:38developer company Elivada Group assures that it has taken into
00:08:41account the peculiarities of neighboring bars. The project provided for enhanced
00:08:45sound insulation, special windows and additional
00:08:48protection of the common wall with the neighboring bar. In the
00:08:52coming years, Narva will undergo large-scale changes. Currently, in the city,
00:08:55about 30 municipal projects with a total
00:08:59cost of almost 70 million euros are simultaneously being implemented or are only
00:09:02preparing for launch. More than 40 million of this amount are funds from European
00:09:06funds. On July 30, it became known about the support
00:09:10of European funds for the second stage of landscaping.
00:09:42proceeded to design the renovation of the historic building in
00:09:45the port, now it houses the rowing base of the Energy
00:09:49Sports School, the task of the project is to preserve the architectural
00:09:52integrity of the building and adapt it to modern needs, the city received
00:09:56half a million euros in state
00:09:59funding for the work, and these funds are planned to be directed
00:10:03primarily to improving
00:10:06the energy efficiency of the building, and of course
00:10:09to improving the indoor climate of the premises. Currently,
00:10:1220 municipal projects are in the implementation
00:10:16stage, and another 10 are being prepared for launch, we
00:10:20have implemented urban municipal investment projects
00:10:23worth about 70 million also
00:10:27and attracted external financing of 47
00:10:30million. And we still have plans for
00:10:34at least projects worth 33
00:10:37million more, so I think that in this period
00:10:41we will reach the 100 million mark. The
00:10:44budget of the projects, and I think that about
00:10:4860-65 percent, at least, will be attracted
00:10:51funds from European Union funds.
00:11:38Two years ago, the descent was closed due to its emergency state. Now, after reconstruction at the expense of the manor owner, the staircase is open to visitors again. I bought the ruins of the manor from the state at public auctions in 2004. From
00:11:42the very beginning, it was clear that the value of this place depended on
00:11:45the possibility of descending to the sea, so the staircase was built one of
00:11:49the first. During the current reconstruction, we simply
00:11:52restored it to its original form, the descent.
00:12:03He is interested in geology, collects stones on the coast, so the opening
00:12:06of the restored staircase was an important event for him. According to him,
00:12:10the descent is well-thought-out and convenient for visitors of different
00:12:13ages. I myself, I am 70 years old, I had bypass
00:12:17surgery, it is quite a complex heart
00:12:20operation, but I climbed up quite calmly, it seemed like I should
00:12:24have died there. No, with small stops, without
00:12:27rushing, whoever did this, felt
00:12:30this whole pedestrian moment, that it is very convenient
00:12:34to walk, these benches that are there, you can sit calmly,
00:12:38catch your breath, even have a sandwich. The owner of the manor could not
00:12:41name the exact length of the staircase. To go down the cliff to the sea,
00:12:45the correspondent of the actual camera took 356
00:12:48steps, and we will move on to the weather for
00:12:51the upcoming day. At night, partly cloudy... with possible
00:12:55short-term rains, wind south-westerly from 3 to 9
00:12:58m/s, on the coast with gusts up to 15, air temperature from
00:13:0214 to 19°. During the day it will be
00:13:05cloudy with clearings, in many areas short-term rains,
00:13:08in some places with thunderstorms, by evening the probability of precipitation will decrease,
00:13:11south-westerly westerly wind will intensify to 5 and 12 with gusts up to
00:13:1517 m/s, by evening it will weaken, the air will warm up to
00:13:1818 and 23°.
00:13:21That's all for the news today, have a good evening and see you soon.
00:13:39He raised Batman and inspired brilliant illusionists,
00:13:43equally convincing for the sarcastic Woody Allen, for
00:13:47the slow, thoughtful Sorrentino, and Christopher
00:13:50Nolan even films him in almost every one of his
00:13:53films. Knight of Her Royal
00:13:56Majesty, exemplary Englishman in New York,
00:13:59Michael
00:14:02Caine. The Road to Hollywood. On Saturday at
00:14:0519:05 on ETV
00:14:07Plus.
00:14:11He is the heir of an ancient family, she is a rebel without
00:14:14fear or ceremonies. Everything divides them,
00:14:17origin, methods, worldviews. But when it
00:14:21comes to truth and justice, they become ideal.
00:14:55I didn't do anything to him, understand,
00:14:58you're chasing your own shadow. Sylvester
00:15:01Stallone in the action film
00:15:04Get Carter on Saturday at 22:30
00:15:07on ETV Plus.
00:15:28Pay
00:15:29attention
00:15:33to this
00:15:35ingenious electrical network. People
00:15:38say that all this hangs by a thread,
00:15:42but the Mirror program is cast
00:15:46iron, that's what people say,
00:15:50enjoy your viewing,
00:16:00today in the program,
00:16:04a brand new apartment, but the problems are old, as if the wires
00:16:08were in water, street art or
00:16:10vandalism? I come the next morning and see it again, I
00:16:14think, is my work in vain?
00:16:15we are located near
00:16:20a relatively new house in a new area
00:16:24in Haberste, moreover, some houses are not even
00:16:27finished yet, they will be delivered in just a few
00:16:31months. No, no, the Mirror did not
00:16:34suddenly start dealing with it. Well, what could be wrong with
00:16:47houses built with the latest construction
00:16:50technology? Well, these houses are
00:16:53new, but the problems are old. Why does it look
00:16:57like you're renovating, the house is new? Hello,
00:17:00the house is new, it's been 2 years since we moved in, and
00:17:04problems started. Some problems were there. There was broken
00:17:08tile, they replaced these doors for us, because
00:17:12you see, I'll even show you that the door
00:17:15is one color, this one is another
00:17:18jamb, because it's the trim, the trim, and I
00:17:22see that the frame is also a little different, yes, yes,
00:17:25yes, yes, yes, that's all, they replaced
00:17:28it. But in general,
00:17:32when we got the keys on May 3rd, and not
00:17:36the 24th, it happened, how to
00:17:39say, since they didn't close something upstairs,
00:17:43the small room was completely flooded. Let's start with
00:17:46the small room. Sounds
00:17:48alarming, if we only start with
00:17:52the small room, it means it's not the only problem,
00:17:56but let's go in order. From
00:17:59here down to this outlet, you see, it
00:18:03has no silicone, nothing,
00:18:06water leaked. Water directly
00:18:09from above, I can show you, all this was sent to
00:18:13the construction company Aslanda, that everything flowed down
00:18:16the wall, here it was so
00:18:20last month I arrived, that from this, how to
00:18:23say, from the top it flowed onto the table, here the table
00:18:26was ruined, a new table, yes, as if
00:18:29a tap was opened, all this water, so to speak, flows from
00:18:33the tap down the entire wall and at the same time leaks.
00:18:40into the outlet installed on the same wall, and not only is the outlet itself inside already rusty and
00:18:44oxidized, but through that very outlet,
00:18:48water reached the wiring in the wall, as if the wires were in
00:18:52water, were completely in water, and
00:18:55yes, yes, yes, this paint held, here
00:18:59it just bubbled a bit, when they removed it, when
00:19:03they removed it, yes, you wouldn't believe it, all the
00:19:06wires... were in water, inside
00:19:09the wall, inside the wall, inside the wall, what am I
00:19:12talking about? But any schoolchild knows that
00:19:16water and wires are incompatible,
00:19:20and such proximity is fraught with consequences, which
00:19:24however, did not take long to
00:19:27arrive.
00:19:33This lamp was located above the bed, my grandson
00:19:37was lying there. We never paid attention to it, my
00:19:40daughter went up, pressed the switch, all these
00:19:43crystal pendants broke, there was
00:19:47such an explosion, glass just
00:19:49fell on my grandson, he was just lying in glass,
00:19:53good thing he was lying face down like this, if he had been lying with his eyes
00:19:57facing the glass, naturally splinters would have gotten into them,
00:20:01yes, the child would have been disabled
00:20:03for life. Of course, in fact, nobody...
00:20:07knows the exact cause for sure, maybe
00:20:11the lamp was simply defective,
00:20:15but it is obvious that water inside the wall
00:20:18causes significant damage. This part, this part,
00:20:22it was soft, so this drywall was
00:20:26in water, when you pressed it, it was like
00:20:29plasticine.
00:20:34So much for "my home, my fortress." It's scary
00:20:38to even live in such a fortress. We
00:20:41constantly had a draft, when we turned on the hood,
00:20:44when we cooked, cold air just came from the floor, just
00:20:48cold, and we couldn't for a long time.
00:21:14But folk wisdom tells us that what is done badly
00:21:18must be redone. Especially since most
00:21:22of the problems mentioned seem easily fixable, you
00:21:26wouldn't believe it, the builder Aslanda
00:21:28completely ignored us,
00:21:32there was complete ignorance, they didn't want to do anything at all,
00:21:36then in December I
00:21:40went to the company located in Mustamäe, the main
00:21:43enterprise, a woman came out, and I
00:21:46said that there was no warranty repair, the warranty is for...
00:22:50water collects there, this
00:22:52water, when it rains, it goes
00:22:56down our wall into the room,
00:23:00yes, all this for her own money,
00:23:03an apartment these days is not a cheap
00:23:06pleasure, as a result, Galina has had to
00:23:09live in another place for almost a
00:23:12month, while her own brand new
00:23:15apartment is covered in plastic. Fortunately, in
00:23:18this house there is an active partnership, which on its
00:23:21part is also making every effort to ensure
00:23:25that the residents of the house still achieve their
00:23:29warranty repair. The company, whose name
00:23:32has been mentioned several times, Aslanda, they built the house, right? Yes, that's
00:23:35right, uh-huh, well, do they react to this? Well, that is,
00:23:39you, well, you're the chairman, you're a resident of the house, to appeal,
00:23:42to say, listen, it's not very well built, to put it mildly, what about that,
00:23:46what are the answers, and the answers are quite... simple
00:23:50and boilerplate, that is, first of all, there is a company that
00:23:53sold apartments, a so-called layer between
00:23:56Astlanda and private individuals, to whom
00:23:59Arendus. Very often, the answers are of such a nature
00:24:03that we ask you not to falsely accuse us
00:24:07of supposedly poor construction quality. Very
00:24:10often, they only start doing something after you start sending
00:24:14links to laws, to some legislative
00:24:17acts, to directives or... construction
00:24:20norms, then it starts to move from
00:24:23a dead stop, but the problems are not only inside the house,
00:24:27but outside, the concrete is cracked,
00:24:31the exterior doors are already covered with rust,
00:24:34the mounting foam and foam plastic stick out into
00:24:37the street. In general, there are many
00:24:40interesting and even amazing solutions, let's call
00:24:43them that. The company Aslandda Ehitus
00:24:47did not want to meet with us, but
00:24:50in their written reply, they assured us that no one is refusing
00:24:54warranty repairs, very soon everything will be
00:24:57tip-top. So, in response to your questions,
00:25:01we inform you that Oü Astlanda Ehitus does not
00:25:05evade its warranty obligations and does not
00:25:08delay their execution without
00:25:11necessity. Immediately after the end of the warranty period and
00:25:14receipt of lists of claims for apartments, we
00:25:18will draw up an action plan.
00:25:28That's what the warranty period is for, to identify possible
00:25:32defects and eliminate them without additional
00:25:35costs for buyers.
00:25:39The defects you mentioned are isolated cases
00:25:42that have been checked and deemed not
00:25:46to pose a threat to human life and health, and also not
00:25:50to impede the use of the living space.
00:25:53stomping our feet,
00:25:57the selling company
00:26:00confirmed to us that according to which warranty
00:26:04work will be carried out after the expiration of the warranty
00:26:07period, was stipulated in the notarized
00:26:10agreement, and generally this is a normal
00:26:13practice, so to speak, to collect all
00:26:17minor defects into one pile and eliminate
00:26:20them in one fell swoop. Well, if something serious happened,
00:26:24then everyone is ready to
00:26:27react immediately. Aslanda reacted, if, as you
00:26:30say, you have already seen? that there
00:26:34is no, well, you didn't see all these problems, because
00:26:38the work was done, but
00:26:40the warranty period in the eleventh
00:26:43house has not actually ended yet, it's like
00:26:46they reacted as they should have,
00:26:49that it
00:26:52is, well, what do you mean, you can't use
00:26:55the apartment as intended, and
00:26:59they came to fix it even before
00:27:02the warranty work began.
00:27:06As always in this situation, details play a key
00:27:09role. The reason why water ended up between
00:27:13the walls has not been fully clarified: if
00:27:16water, for example, got into the cavities of the panels during
00:27:19construction, and no more water is accumulating inside,
00:27:22then this is indeed a relatively
00:27:25common situation, but
00:27:28if new water is constantly penetrating
00:27:31the structures, then it is necessary
00:27:34to react immediately. There should be no
00:27:37water in the structure, so accordingly, this is a problem
00:27:40that, let's say, is very serious, which, in my opinion, cannot
00:27:44wait for the end
00:27:46of the 2-year warranty period, uh-huh, that is,
00:27:50let's say, there are problems that you can live with, these may be some
00:27:54minor cracks, building settlement, which within
00:27:572 years, let's say, the building is still settling, they
00:28:01appear -
00:28:22to do them all at once, but there are things that affect operation, and for example, if a faucet or sewage pipe leaked in the apartment, they wouldn't wait 2 years, well, yes, if they did it right away, because
00:28:25it needs to be used, it's the same here, as I say, there shouldn't
00:28:29be water in the structure, if it appeared there,
00:28:32then, in my opinion, this problem needs to be solved
00:28:36immediately. It's important to remember one thing, that
00:28:39according to Estonian legislation, warranty
00:28:42repairs also have their own
00:28:45warranty, that is, if during the warranty period
00:28:49you...